The market was opened by Sheikh Jaber Al-Ahmad Al-Sabah, with a construction period of two and a half years. The project includes 70 stores, 20 fast food restaurants, and three cinemas, as well as a water dock with a capacity of 365 berths.
The market was opened by Sheikh Jaber Al-Ahmad Al-Sabah, with a construction period of two and a half years. The project includes 70 stores, 20 fast food restaurants, and three cinemas, as well as a water dock with a capacity of 365 berths.